Partille Energi Nät AB owns the electricity lines in Partille. We are responsible for ensuring that electricity reaches all villas, apartments, companies, public premises and other businesses in the municipality.
It is important that we can deliver electricity safely and securely to you. That is why we invest in the power grid, upgrade and rearrange to ensure delivery every day. We also want it to be good to live and work in Partille, so our electricity grid rates are among the lowest in Sweden.
It is important that we can deliver electricity safely and securely to you. That is why we invest in the power grid, upgrade and rearrange it to ensure delivery every day.
We also want it to be good to live and work in Partille, so our electricity tariffs are among the lowest in Sweden.
Subscription
Electricity transmission
Power
Subscription
Electricity transmission
Power
The electricity network fee is divided into two or three parts depending on the type of residence.
Subscription – a fixed annual fee that you pay for access to the electricity grid and which is controlled based on the size of the meter fuse.
Electricity transmission – a variable fee for the actual transport of electricity through the electricity grid that is controlled by how much electricity you use.
Power – a variable fee for the maximum load on the electricity network capacity and is controlled by your highest hourly consumption each month. If you live in an apartment in an apartment building with at least three apartments that are connected to a common service line and where the meter fuse for your apartment subscription is a maximum of 16A, you do not have a power component in your electricity network fee. Below you can read more about the “power fee”
When you move, it is important that you sign a new electricity contract and cancel the existing one for the home you are moving from.
Each home has a specific facility ID that is tied to the property. The electricity contract is tied to this number and cannot be moved with it. Therefore, you must cancel your electricity contract when you move and sign a new one for your new home. If you are moving within Partille, you can do everything via the form under Customer Service here on our website.
If you are moving from Partille municipality, it is important that you find out who the electricity grid owner is in your new place of residence. Please note that you need to notify us 14 days before you move so that everything works properly.
You can find the contractual terms and conditions that apply to electricity grid delivery to private individuals below.
The model for the power fee will change from September 1, 2026. Here you can read more about what applies in Partille and what the change may mean for you as a customer.
If you are building a new home, or moving into a property without electricity, you need to order a new permanent electrical connection.
Distance
Kr
Distance
Kr
Distance
Kr
Distance
Kr
If you want a subscription to be terminated completely, and the meter to be removed, we want you to hire an authorized electrician to submit a pre- and completion notification to us. This can happen, for example, if you are going to rebuild a house where a meter has previously been installed, or if the house is going to be demolished.
From autumn 2023 until the end of 2024, we have replaced all electricity meters in Partille. The new electricity meter is called OMNIA® e-meter. It has several good features, such as a new customer interface, HAN (Home Area Network). This allows you to connect equipment to monitor and control your electricity usage.
Do you need to change the fuse size, expand from 1-phase to 3-phase, change the location of the meter cabinet or make other changes to your existing electrical installation? Then contact a qualified electrical installer who will in turn place an order with us.
Expansion to 3-phase
3 125 SEK
Additional subscription
3 000 SEK
Changing fuse size or other change
According to quote
If you are going to carry out excavation work, it is always important to order a cable guide. This will avoid the risk of causing a power outage by accidentally digging up cables.
All instructions for wires and cables must be ordered at least 5 days before the work begins. You can easily do this via ledningskollen.se. After registration, our supplier Geomatikk will carry out the placement that you requested via the account you created.
Ledningskollen.se is a free web service run by the Swedish Post and Telecom Agency, where many line owners are connected.
You may need a temporary power grid connection, known as construction power, to provide electricity to a property or facility during the construction period. All prices on this page include VAT.
Energy tax is added.
You order a temporary connection through an authorized electrical installer who submits a preliminary and completion notification to us in the same way as for a new connection.
Prices for temporary installations with higher meter fuses than 63 A can be found under
Electricity network for business customers.
Ampere
Kr
Subscription cost
Electricity transmission
Power fee
As an electrical installer, you are the one who helps our customers when they want to connect to the electricity grid, make changes to their subscription or order other work that affects the electricity grid.
Partille Energi uses a web-based system for contacts with installers. This means that companies can easily register all the necessary information themselves and also follow the entire case.
Registration for the installer website
From December 1, 2022, we have a new platform called Installatörswebben. If you have any questions, please contact our customer service.
Do this