Particle energy

Power grid for businesses

Partille Energi Nät AB owns the electricity lines in Partille. We are responsible for ensuring that electricity reaches homes, businesses, public premises and other businesses in the municipality. For us, it is important to be able to deliver safely and securely.

We are constantly planning for current and future needs so that you get the electricity you need for your business. As an example, we can mention that almost the entire electricity network in Partille is now underground.

Prices and agreements 2025 and 2026

There are three different electricity grid tariffs for business subscriptions depending on the size of the facility.  

If you want to pay energy tax yourself, it is important that you inform us when you sign up for a subscription. 

Below are prices for those of you who are entrepreneurs.
All prices are exclusive of VAT. Energy tax is added.

Meter fuse max 63A

SEK 1/year

Subscription

24,40 öre/kWh

Electricity transmission

SEK 26,00/kW, monthly

Power

Meter fuse above 63A

SEK 9/year

Subscription

12,50 öre/kWh

Electricity transmission

SEK 59,00/kW, monthly

Power

High voltage subscription 10 kV

SEK 16/year

Subscription

9,00 öre/kWh

Electricity transmission

SEK 49,00/kW, monthly

Power

SEK 15,00/kVAr

Reactive power

You pay energy tax for your electricity use and the tax is charged on your electricity bill. In 2025, the energy tax will be 43,9 öre/kWh.

Below are prices for those of you who are entrepreneurs.
All prices are exclusive of VAT. Energy tax is added.

Meter fuse max 63A

SEK 1/year

Subscription

25,00 öre/kWh

Electricity transmission

SEK 26,80/kW, monthly

Power

Meter fuse above 63A

SEK 10/year

Subscription

12,50 öre/kWh

Electricity transmission

SEK 59,00/kW, monthly

Power

High voltage subscription 10 kV

SEK 33/year

Subscription

9,00 öre/kWh

Electricity transmission

SEK 49,00/kW, monthly

Power

SEK 15,00/kVAr

Reactive power

You pay energy tax for your electricity use and the tax is charged on your electricity bill. From 1 January 2026, the energy tax will be 36,00 öre/kWh.

The subscription is a fixed annual fee that you pay for access to the electricity grid. It is controlled based on the size of the meter fuse.

Electricity transmission is a variable fee for the transport of electricity through the electricity grid. It is controlled by how much electricity is used.

Power is a variable fee for the maximum load on the electricity grid capacity. It is controlled by the highest hourly consumption each month (kW).

Reactive power charge is a variable fee of the highest measured active power in kW each month. It is based on the withdrawal of reactive power in kVAr exceeding 50 percent for 10 kV (15 percent for 130 kV).

When the company is moving, it is important to sign a new electricity grid agreement and terminate the existing one at the facility you are moving from.

Each electrical installation has a specific installation ID that is tied to the property and the electricity network agreement cannot be moved with it. Therefore, it is important that you terminate the agreement when moving and sign a new one at the new address. If the move takes place within Partille, it can be done easily via the form under Customer Service here on the website.

If the move is outside of Partille, it is important to check who owns the network where you are moving. Remember to notify Partille Energi 14 days before the move to ensure everything works as it should.

The contractual terms and conditions that apply to electricity grid delivery to business customers can be found under
Documents and forms 

Link to relocation form

Photo of the Säveån River and the station bridge
Photo of hairdresser with customer

Electricity usage and reading

Remote reading and billing

The electricity meters are read via a signal on the electricity network, so-called remote reading. This means that the actual electricity usage is invoiced and you avoid surprise reconciliation invoices. When you move, you do not need to read the meter, but it is automatically sent to us at Partille Energi.

For more detailed information about your electricity usage, we recommend that you log in to My Pages. There you can also compare your electricity usage with previous months or years. We normally invoice business customers for electricity network fees every month or every other month.

Logging in to My Pages is done with BankID. Contact our Customer Service if you want to register people who should have access to your account on My Pages and we will help you with that.

Access to metrics

From 5 January 2025, new EU rules will apply for how electricity grid companies must provide customers with access to their meter readings. The aim is to give electricity customers better opportunities to adapt their energy use, offer flexibility and lower their electricity costs.

Partille Energis electricity network customers have access to the measurement values ​​that we register for their facilities via Mina sidor. These measurement values ​​form the basis for our charging of electricity network fees and which we also report to the customers' electricity suppliers.

Logging in to My Pages is done with Bank-ID. Private customers automatically gain access to My Pages when we register an electricity network agreement. Corporate customers are welcome to contact our Customer Service to notify which people within the company should have access to My Pages.

In addition to being able to see the measurement values ​​on My Pages, it is also possible to export them to an Excel file.

Please note that metrics will be available on My Pages no earlier than the day after they have been generated.

Due to new laws and regulations that will come into force in 2025, the handling of meter values ​​for eligible parties will change. Eligible parties are, for example, companies with which our electricity network customer has entered into an agreement for energy services or energy optimization. The change means, among other things, that electricity network customers themselves will be able to more easily administer and keep track of which companies have been approved for access to their meter values. The changes also mean that access to meter values ​​for eligible parties will be subject to a fee.

For Partille Energis electricity network customers will be managed to make meter values ​​available to eligible parties from June 1, 2025 via a website provided by our partner Embriq Sweden AB

It is via this website that an electricity network customer with us can

  • see which energy service companies have requested access to the customer's meter readings.
  • approve a request from companies that have applied for access to measurement values.
  • withdraw approval from companies that were previously approved for access to measurement values.

In order for third parties to have access to our customers' measurement values, the following is required:

  1. a valid Ediel agreement with Svenska kraftnät.
    Read more Swedish power grid. 
  2. an agreement with Partille Energi Nät AB regarding the availability of metering and consumption data. Contact us via backoffice@partilleenergi.se if you want to sign such an agreement.
  3. send a sharing request via Ediel.
    Instructions for this procedure can be found at Swedish power grid.

In order for the sharing of metrics to start, the customer (or a person approved by the customer) must log in to our partner Embriq's portal for this and approve the request. If the request is not approved within 3 weeks, the request expires and a new request needs to be sent.

Ongoing administration fee

SEK 150/month per energy service company with at least one sharing of meter values

New request for sharing for individual facility

SEK 5 per facility and request

Request for termination for individual facility

SEK 5 per facility and request

All prices are stated excluding VAT. Changes to prices will be announced at least two months before they are to come into effect. Invoicing is done monthly in arrears.

Photo person at computer

Partille Energi follows the Energy Market Inspectorate's model for pricing new connections. The distance is measured as the crow flies between the connection and the nearest existing connection point in the electricity network. The extra meter fee is only charged on meters that exceed the lower interval within each zone. If you are unsure of what applies, you can always request a quote. All prices are exclusive of VAT.

Connection with service fuse 16-25 A

0-199 meters

Distance

43 000 SEK

Cost

200-600 meters

Distance

43 SEK + 000 SEK/meter

Cost

600-1200 meters

Distance

190 SEK + 600 SEK/meter

Cost

1200-1800 meters

Distance

762 SEK + 400 SEK/meter

Cost

Connection with service fuse from 35 A and up

We provide quotes for all connections for service fuses from 35 A and up, regardless of distance. Cost for electrical cable is additional.

If you want a subscription to be terminated completely and the meter to be taken down
You should hire an authorized electrician to submit a preliminary and completion report to us. This can be, for example, when renovating a house where a meter has previously been installed or if the house is to be demolished.

The electricity meter is Partille Energis property. If we are missing a customer elfacility for a longer period of time and the property owner does not want to pay for the subscription Partille Energi right to take down the meter.  

New connection

If you are building a new home, or moving into a property without electricity, a new permanent electrical connection is needed.

The first step is to contact an authorized electrician. The electrician will make a report via Installer's website.

It is the electrical installer who primarily has contact with the electricity company.

Change in existing facility

Do you need to change the fuse size, expand from 1-phase to 3-phase, change the location of the meter cabinet or make other changes to your existing electrical installation? Then contact a qualified electrical installer who will in turn place an order via pre-registration and completion notification to us. 

Expansion to 3-phase
2 500 SEK

Additional subscription
2 400 SEK

Changing fuse size or other change
According to quote

Prices are quoted excluding VAT.
3 phase socket

Excavating, building and ordering temporary electricity

If you are going to carry out excavation work, it is always important to order a cable guide. This will prevent you from accidentally digging up cables.

If you are going to carry out excavation work, excavation or blasting, it is always important to order a cable instruction. This will avoid the risk of power outages due to mistakes such as unearthed cables. All instructions for wires and cables must be ordered at least 5 days before the work begins. This can be easily done via ledningskollen.se. After registration, Partille Energis provider Geomatikk to carry out the stakeout requested via the created account.

Ledningskollen.se is a free web service run by the Swedish Post and Telecom Agency, where many line owners are connected.

Think about it!
You are always responsible for any damage caused by the excavation.

Link to ledningskollen.se

A temporary electricity connection, known as construction power, is sometimes needed to provide electricity to a property or facility during the construction period. All prices on this page are exclusive of VAT. Energy tax is added.

You order a temporary connection through an authorized electrical installer who submits a preliminary and completion notification to us in the same way as for a new connection.

Meter fuse 25 A - 63 A

2 200 SEK

Connection cost
(one-time cost)

SEK 1/year

Subscription
(current fee)

24,50 öre/kWh

Electricity transmission
(current fee)

SEK 26,00/kW

Power fee
(current fee)

Meter fuse above 63 A

4 800 SEK

Connection cost
(one-time cost)

SEK 9/year

Subscription
(current fee)

12,50 öre/kWh

Electricity transmission
(current fee)

SEK 59,00/kW

Power fee
(current fee)

Installer's website

As an electrical installer, you are the one who helps our customers when they want to connect to the electricity grid, make changes to their subscription or order other work that affects the electricity grid.

Partille Energi uses a web-based system for contacts with installers. This means that companies can easily register all the necessary information themselves and also follow the entire case.

Registration for the installer website

From December 1, 2022, we have a new platform called Installatörswebben. If you have any questions, please contact our customer service.

Do this

  • Register using the form via the link below.
  • You will receive a confirmation of your registration.
  • An email will be sent with login details.
  • Log in with the password you received in the email and register your installation case.
Installer connects plug
News - Electricity grid

Read the latest about electricity networks

Please tell us about our new website.

We've just launched a new version of our website. Please let us know what you think - it only takes a few seconds!
Choose any number of statements that match your experience.
1.0x