Partille Energi Nät AB owns the electricity lines in Partille. We are responsible for ensuring that electricity reaches homes, businesses, public premises and other businesses in the municipality. For us, it is important to be able to deliver safely and securely.
We are constantly planning for current and future needs so that you get the electricity you need for your business. As an example, we can mention that almost the entire electricity network in Partille is now underground.
There are three different electricity grid tariffs for business subscriptions depending on the size of the facility.
If you want to pay energy tax yourself, it is important that you inform us when you sign up for a subscription.
Subscription
Electricity transmission
Power
Subscription
Electricity transmission
Power
Subscription
Electricity transmission
Power
Reactive power
Subscription
Electricity transmission
Power
Subscription
Electricity transmission
Power
Subscription
Electricity transmission
Power
Reactive power
The subscription is a fixed annual fee that you pay for access to the electricity grid. It is controlled based on the size of the meter fuse.
Electricity transmission is a variable fee for the transport of electricity through the electricity grid. It is controlled by how much electricity is used.
Power is a variable fee for the maximum load on the electricity grid capacity. It is controlled by the highest hourly consumption each month (kW).
Reactive power charge is a variable fee of the highest measured active power in kW each month. It is based on the withdrawal of reactive power in kVAr exceeding 50 percent for 10 kV (15 percent for 130 kV).
When the company is moving, it is important to sign a new electricity grid agreement and terminate the existing one at the facility you are moving from.
Each electrical installation has a specific installation ID that is tied to the property and the electricity network agreement cannot be moved with it. Therefore, it is important that you terminate the agreement when moving and sign a new one at the new address. If the move takes place within Partille, it can be done easily via the form under Customer Service here on the website.
If the move is outside of Partille, it is important to check who owns the network where you are moving. Remember to notify Partille Energi 14 days before the move to ensure everything works as it should.
The contractual terms and conditions that apply to electricity grid delivery to business customers can be found under
Documents and forms
Partille Energis electricity network customers have access to the measurement values that we register for their facilities via Mina sidor. These measurement values form the basis for our charging of electricity network fees and which we also report to the customers' electricity suppliers.
Logging in to My Pages is done with Bank-ID. Private customers automatically gain access to My Pages when we register an electricity network agreement. Corporate customers are welcome to contact our Customer Service to notify which people within the company should have access to My Pages.
In addition to being able to see the measurement values on My Pages, it is also possible to export them to an Excel file.
Please note that metrics will be available on My Pages no earlier than the day after they have been generated.
Due to new laws and regulations that will come into force in 2025, the handling of meter values for eligible parties will change. Eligible parties are, for example, companies with which our electricity network customer has entered into an agreement for energy services or energy optimization. The change means, among other things, that electricity network customers themselves will be able to more easily administer and keep track of which companies have been approved for access to their meter values. The changes also mean that access to meter values for eligible parties will be subject to a fee.
For Partille Energis electricity network customers will be managed to make meter values available to eligible parties from June 1, 2025 via a website provided by our partner Embriq Sweden AB.
It is via this website that an electricity network customer with us can
In order for third parties to have access to our customers' measurement values, the following is required:
In order for the sharing of metrics to start, the customer (or a person approved by the customer) must log in to our partner Embriq's portal for this and approve the request. If the request is not approved within 3 weeks, the request expires and a new request needs to be sent.
SEK 150/month per energy service company with at least one sharing of meter values
SEK 5 per facility and request
SEK 5 per facility and request
All prices are stated excluding VAT. Changes to prices will be announced at least two months before they are to come into effect. Invoicing is done monthly in arrears.
Partille Energi follows the Energy Market Inspectorate's model for pricing new connections. The distance is measured as the crow flies between the connection and the nearest existing connection point in the electricity network. The extra meter fee is only charged on meters that exceed the lower interval within each zone. If you are unsure of what applies, you can always request a quote. All prices are exclusive of VAT.
Distance
Cost
Distance
Cost
Distance
Cost
Distance
Cost
If you want a subscription to be terminated completely and the meter to be taken down
You should hire an authorized electrician to submit a preliminary and completion report to us. This can be, for example, when renovating a house where a meter has previously been installed or if the house is to be demolished.
The electricity meter is Partille Energis property. If we are missing a customer elfacility for a longer period of time and the property owner does not want to pay for the subscription Partille Energi right to take down the meter.
If you are building a new home, or moving into a property without electricity, a new permanent electrical connection is needed.
The first step is to contact an authorized electrician. The electrician will make a report via Installer's website.
It is the electrical installer who primarily has contact with the electricity company.
Do you need to change the fuse size, expand from 1-phase to 3-phase, change the location of the meter cabinet or make other changes to your existing electrical installation? Then contact a qualified electrical installer who will in turn place an order via pre-registration and completion notification to us.
Expansion to 3-phase
2 500 SEK
Additional subscription
2 400 SEK
Changing fuse size or other change
According to quote
If you are going to carry out excavation work, it is always important to order a cable guide. This will prevent you from accidentally digging up cables.
If you are going to carry out excavation work, excavation or blasting, it is always important to order a cable instruction. This will avoid the risk of power outages due to mistakes such as unearthed cables. All instructions for wires and cables must be ordered at least 5 days before the work begins. This can be easily done via ledningskollen.se. After registration, Partille Energis provider Geomatikk to carry out the stakeout requested via the created account.
Ledningskollen.se is a free web service run by the Swedish Post and Telecom Agency, where many line owners are connected.
Think about it!
You are always responsible for any damage caused by the excavation.
Connection cost
(one-time cost)
Subscription
(current fee)
Electricity transmission
(current fee)
Power fee
(current fee)
Connection cost
(one-time cost)
Subscription
(current fee)
Electricity transmission
(current fee)
Power fee
(current fee)
As an electrical installer, you are the one who helps our customers when they want to connect to the electricity grid, make changes to their subscription or order other work that affects the electricity grid.
Partille Energi uses a web-based system for contacts with installers. This means that companies can easily register all the necessary information themselves and also follow the entire case.
Registration for the installer website
From December 1, 2022, we have a new platform called Installatörswebben. If you have any questions, please contact our customer service.
Do this